top of page
admin@whluk.com | 0161 706 1067
Case Studies
Case Studies
WHL Projects
Public Sector
Roofing Refurbishment and Safety Upgrades – Manchester School by WHL Projects
Suspended Timber Floor Repair – Manchester School by WHL Projects
Ceiling Replacement and Room Refurbishment – Manchester School by WHL Projects
Emergency Replacement Ceiling Job at a School in Manchester
External Insulated Render System Installation at a Health Centre in Leigh
Staircase Refurbishment for a School in the Lake District
Residential Sector
Damp Remediation and Wall Restoration – Buxton by WHL Projects
Residential Property Renovation - Hale by WHL Projects
Rebuilding of Gable Wall – Manchester by WHL Projects
Structural Alterations for 1930s House - Manchester
Structural Alterations for 1930s House – Chimney Breast and Stack Removal
Underground Drainage, Foundation, and Floor Slab Construction up to DPC – Styal, Cheshire by WHL Projects
bottom of page